How is asset downtime calculated?

How is asset downtime calculated?

Downtime refers to the period during which an asset is not operational or available due to complete shutdown, malfunction, or unavailability due to planned maintenance.


For calculating downtime:
  1. When the asset goes down, the start timestamp is noted

  2. When the asset is up, the end timestamp is noted

  3. The difference between end and start time will give the downtime duration for that instance

  4. Similarly, when this activity is carried out continuously during an asset lifecycle, we will get the cumulative downtime for an asset

  5. This calculation will give you the downtime period in days, hours, minutes, or seconds, depending on the level of precision required.


How does the system know when a particular Asset is down/ up:
  1. The system is dependent on the user to change Asset Statuses to know when the state changes
  2. If the Asset status is marked as Inactive, Under Maintenance, Retired or any custom status that has been attributed as downtime, then the system marks the device as down and calculates the downtime
  3. As soon as the Asset status is marked as Active or any custom status that has been attributed as uptime, then the system marks the device as Up and running 
Read more about managing Asset Status.
Alert
Note : It is recommended to change the Asset Status while performing scheduled maintenance activities/ breakdown repairs. 




Also read the following articles to master the IQnext assets module
  1. Asset Page Overview

  2. How to add Vendors

  3. How to add assets

  4. Basic overview of Asset QR Codes and how to print

  5. How to keep track of your Asset Warranty?

  6. Asset Dashboard overview


    • Related Articles

    • Assets: How to change asset status ?

      To change asset status, follow these steps: Go to the assets page. In the asset list view, locate and select the specific asset for which you want to change the status. After selecting the desired asset, the asset details page opens up. On the asset ...
    • How to archive or delete an asset?

      Go to the Assets Page Locate the Asset in the Asset list view for which you want to delete. In the asset row, on the right end, you will find three dots or the options menu. Click on the three dots to open the menu with required actions for the asset ...
    • How To Set Multi asset Preventive Maintenance (PM) Trigger Scheduling?

      To set up multi-asset preventive maintenance (PM) trigger scheduling, follow these steps: Go to the maintenance page On the left panel, find "preventive maintenance." In this page, you will see a list of existing PM tasks. To add a new one, click on ...
    • Assets: How to Keep Track of your Warranty?

      For keeping track of Asset warranty, you need to add date of purchase and warranty period when adding the asset to the IQnext platform. Once the details have been added, follow these steps: For Individual asset: Access the assets page. In the asset ...
    • How to add assets ?

      Go to the Assets page on the IQnext platform There are two options to add Assets to IQnext Add Single Asset - To add assets individually Add Bulk Asset - To add multiple assets in one go Single Asset: Choose "Add Single Asset" on the top right corner ...